Kuala Lumpur PIPE ROOF PROJECT

    Kuala Lumpur, the capital of Malaysia, is famous for the Petronas Twin  Towers,
    which boasts a height of 451m. As the city continues to develop day by day, it is in an urgent need to further improve the transportation network.
    The KVMRT (Klang Valley Mass Rapid Transit), which connects the east and west of the metropolitan area, is under construction.

    The plan is to cross several aortas of the transportation network, and the pipe roof 
    method with Unclemole Super has been adopted for the  underground crossing of the Kuala Lumpur Seremban Expressway, and it is currently under excavation. Since it is a big project, we have daily  inspections and safety inspections, and we are aiming for the
    early completion of the construction with a close attention.

    CONSTRUCTION SUMMARY
    Construction Site: Kuala Lumpur, Malaysia
    Pipe Type: Steel pipe φ800mm×9m
    Pipe Roof Length: 60m×23no.×2places
    Total Length: 2760m
    Soil Condition: Sandy Gravel
    Minimum earth cover depth: 4m

    MACHINE SPECIFICATION
    UNCLEMOLE SUPER
    Outer diameter:812mm
    Machine Length: 3020mm
    Weight:3800kg
    Crusher type: Cone crusher